Q. 411: What is the term for a series of steps that check whether a requirement is met?
A. An instance
B. A cycle
C. A test set
D. A test
<<<<<< =================== >>>>>>
Q. 412: When naming a requirement, which names are valid? (Select three.)
A. FlightTicket
B. Flight^Ticket
C. Flight_Ticket
D. Flight*Ticket
E. FlightTicket
F. Flight.Ticket
<<<<<< =================== >>>>>>
Q. 413: What is the relationship between requirements, releases, and cycles?
A. Requirements, releases, and cycles can be assigned to libraries.
B. Libraries can be assigned to requirements, releases, and cycles.
C. Releases and cycles are used for version control of requirements.
D. Requirements can be assigned to releases and cycles.
<<<<<< =================== >>>>>>
Q. 414: Which view provides a non-hierarchical view of requirements data?
A. Requirements Grid view
B. Requirements Non-hierarchical view
C. Requirements view
D. Requirements Coverage view
<<<<<< =================== >>>>>>
Q. 415: What are the testing levels in risk-based testing?
A. Full, Partial, Basic, and Completed
B. Assigned, Full, Partial, and Basic
C. Full, Partial, Basic, and None
D. Full, Partial, Basic, and Advanced
<<<<<< =================== >>>>>>
Q. 416: Which tabs can be found under the Requirements Traceability tab?
A. Relationships and Impact Analysis
B. Relationships and Functional Complexity
C. Relationship Link and Impact Analysis
D. Relationship Advancement and Impact Analysis
<<<<<< =================== >>>>>>
Q. 417: What is the function of an Impact Analysis?
A. To graph the impact of requirement changes
B. To analyze the impact of requirement changes
C. To graph the impact of requirement complexity
D. To analyze the impact of the requirement list
<<<<<< =================== >>>>>>
Q. 418: What does business criticality determine?
A. How redundant a requirement is for a business
B. How critical a requirement is for a business
C. How critical a requirement is for a project
D. How critical a requirement is for the software life cycle
<<<<<< =================== >>>>>>
Q. 419: What is the relationship between requirements and tests? (Select two.)
A. A test can cover more than one requirement.
B. A requirement can be covered by more than one test.
C. A test can cover only one requirement.
D. A requirement can be covered by only one test.
E. A maximum of ten tests can cover a requirement.
<<<<<< =================== >>>>>>
Q. 420: Which steps are considered part of the risk-based testing process? (Select two.)
A. Establish Business Criticality, Assess Functional Complexity
B. Establish Failure Probability, Perform Risk Assessment
C. View Analysis Results, Assess Impact Analysis
D. Establish Failure Probability, Perform Risk Analysis
E. Assess Risk, Calculate Failure Probability
Read the Correct Answer of the above Questions
Access the Full Database of All Questions
Correct Answers to Earlier Questions – Q.401 to Q 410 are as under:
Question No. | Correct Answer |
Q. 401 | C |
Q. 402 | D |
Q. 403 | B,C,E |
Q. 404 | D |
Q. 405 | B |
Q. 406 | B |
Q. 407 | B,E |
Q. 408 | D |
Q. 409 | C |
Q. 410 | E |