ISTQB Advanced Level Test Analyst & Technical Test Analyst Exam – Sample Paper: Q. 111 to 120
Deep study of this additional set of 120 questions recently uploaded shall be of great help in getting success in ISTQB CTAL Advanced Level Test Analyst & Technical Test Analyst Exam. All these questions are based upon ISTQB Certified Tester Advanced Level Syllabus V 2007.
Set of 10 Questions (Q. 111 to 120)
Correct Answers of earlier Q. 101 to 110 are at the end of this page:
Q. 111: Which of the following statements is true?
A. MISRA Report 6 recommends use of decision tables
B. MISRA
Report 6 does not address requirements coverage
C. MISRA Report 6 recommends testing errors and out-of-range conditions
D. MISRA Report 6 recommends testing as the only quality assurance technique
<<<<<< =================== >>>>>>
Q. 112: Which of the following is NOT a possible outcome of a review?
A. Declaring the item under review complete
B. Declaring the item under review complete if certain changes are made
C. Declaring the item under review as needing major changes followed by a re-review
D. Changing the person responsible for writing the item under review
<<<<<< =================== >>>>>>
Q. 113: Objectives of test implementation phase are;
I. Create test procedures.
II. Finalize and create test data and set up environment
III. Create a test execution schedule / order
IV. Check test level entry criteria
A. I and II true. III and IV false
B. II, III and IV true. I false
C. I, II, III and IV true.
D. III and IV true, I and II false
<<<<<< =================== >>>>>>
Q. 114: A programmer working in the Czech Republic writes a new object to be included in an existing system. He sends the files out for review via e-mail to some other people working on the same project, including a fellow programmer in India, a senior programmer in her office, and two test engineers in Austin. He asks for comments back via e-mail within three days. What would this type of review be called?
A. Informal
B. Inspection
C. Walkthrough
D. Technical review
<<<<<< =================== >>>>>>
Q. 115: During a walkthrough meeting for a high-level design, a tester who is participating as a reviewer asks the system architect who created the document why only physical network connections are supported in the design, rather than also supporting wireless connections. The designer replies that they did not have time to address the security concerns raised by wireless access to the system. The tester accepts that answer and the review proceeds.
Which of the following is an objective of a review that was achieved in that exchange?
A. Increased reviewer understanding
B. Early detection of a defect
C. Correction of a defect
D. Analysis of system design
<<<<<< =================== >>>>>>
Q. 116: Which of the following statements are true?
I. Early test planning and later test execution is an activity of sequential software development model
II. Change and configuration management are not needed for software testing activities.
III. Based on the project context, additional levels of testing like hardware-software integration testing, feature interaction testing can be done.
IV. System test planning and project planning could occur concurrently in V-model.
A. I, II and III are true.
B. II, III and IV are true.
C. I, Ill and IV are true.
D. I and Ill are true.
<<<<<< =================== >>>>>>
Q. 117: Which of the following statements is true?
A. To make the review meeting efficient, reviewers should bring points for discussion to a technical review.
B. To keep an open mind, reviewers should not read the item under review prior to a technical review.
C. To make problem resolution faster, reviewers should bring problems and solutions to a technical review.
D. To keep the review meeting under two hours, reviewers should avoid discussion of controversial points in a technical review.
<<<<<< =================== >>>>>>
Q. 118: According to ISTQB syllabus, characteristics of systems of systems are;
I. Long duration of projects
II. Multiple levels of integration
III. Need for Maintenance Testing
IV. No formal development lifecycle or milestones.
A. I, II true, Ill and IV false.
B. I, II, Ill true, IV false.
C. II, III IV true, I false.
D. All of the above are true.
<<<<<< =================== >>>>>>
Q. 119: You are testing a computerized gas pump that allows users to pay using credit cards. Four types of cards are accepted: Visa, Mastercard, Discover, and American Express. The pump will reject any other type of card. If given an accepted credit card, the pump validates the card. If the card is valid, the pump is turned on and the customer is told to begin pumping gas. The pump remains on until the transaction ends. The transaction ends when one of the following events occurs:
# Pump handle is returned to pump
# Amount reaches transaction limit for card
# No gas is pumped within two minutes of validation of card
# Emergency shut-off switch is thrown by the station attendant
Assume that a test is consists of a triple set of values, (card type, card validity, transaction ending). Design the minimum number of tests needed to cover all the equivalence partitions for each card brand, including both valid and invalid cards of each accepted type, along with covering each equivalence partition for transaction endings.
How many tests do you need?
A. 4
B. 5
C. 9
D. 17
<<<<<< =================== >>>>>>
Q. 120: A software company hired a well qualified consultant to perform a test process improvement assessment. The consultant concluded from the assessment that the software company is at the Initial level (Level 1) and provided few recommendations to improve the test process to next level (Definition). The test process improvement model he selected has 5 levels (5 being the highest level / Optimization).
According to the ISTQB syllabus, what process improvement model did he select?
A. CMMI (Capability Maturity Model Integration)
B. CTP (Critical Testing Process)
C. TMM (Testing Maturity Model)
D. TPI (Test Process Improvement)
Read the Correct Answers of the above Questions
Full Database of All Question for Advanced Level Test Analyst and Technical Test Analyst Exams
Correct Answers to the Earlier Questions – Q. 101 to Q 110 are as under:
Question No. | Correct Answer |
Q. 101 | C |
Q. 102 | C |
Q. 103 | D |
Q. 104 | C |
Q. 105 | C |
Q. 106 | A |
Q. 107 | A |
Q. 108 | B |
Q. 109 | A |
Q. 110 | B |
An expert on R&D, Online Training and Publishing. He is M.Tech. (Honours) and is a part of the STG team since inception.