ISTQB Advanced Level Test Analyst & Technical Test Analyst Exam – Sample Paper: Q. 101 to 110
Deep study of this additional set of 120 questions recently uploaded shall be of great help in getting success in ISTQB CTAL Advanced Level Test Analyst & Technical Test Analyst Exam. All these questions are based upon ISTQB Certified Tester Advanced Level Syllabus V 2007.
Set of 10 Questions (Q. 101 to 110)
Correct Answers of earlier Q. 91 to 100 are at the end of this page:
Q. 101: Which of the following is the primary test basis for acceptance testing?
A. High-level design specification
B. Low-level design specification
C.
Requirements specification
D. Defect reports from earlier releases
<<<<<< =================== >>>>>>
Q. 102: The main Objective of Test Analysis and Design phase is to;
A. Create test strategy and test plan
B. Design and create the test environment
C. Identify test conditions and create test cases
D. Archive test results, logs and reports in the configuration management system
<<<<<< =================== >>>>>>
Q. 103: Consider the following documents that might be produced during a typical project:
I. Requirements specification
II. Project plan
III. Test plan
IV. Design specification
V. Defect report
Which of these items could benefit from a review?
A. Items I, II, and IV
B. Items III and V
C. Items I, II, and III
D. Items I, II, III, IV, and V
<<<<<< =================== >>>>>>
Q. 104: Which of the statements are true about Test Strategy approaches?
I. Company can use analytical strategy (risk based) for their test strategy.
II. Company can use dynamic strategy for their test strategy.
III. Company may combine two or more test strategies for their test activities.
IV. Company may not have a test strategy document.
A. I and II true
B. I II and Ill true
C. I, II, III and IV true
D. I, II, IV true
<<<<<< =================== >>>>>>
Q. 105: What is the difference between designing tests with three boundary values per boundary and designing boundary value tests with two boundary values per boundary?
A. Use of three boundary values per boundary results in one valid value and two invalid values per boundary, while with two boundary values per boundary, there is one valid value and one invalid value
B. Use of three boundary values per boundary results in two valid values and one invalid values per boundary, while with two boundary values per boundary, there is one valid value and one invalid value
C. With three boundary values per boundary, the boundary itself is considered a possible value, while with two boundary values per boundary, the boundary lies between two adjacent possible values
D. With three boundary values per boundary, you are guaranteed to test the two equivalence partitions on each side of the boundary, while with two boundary values per boundary you might not test the two equivalence partitions on each side of the boundary
<<<<<< =================== >>>>>>
Q. 106: Which of the following is true about safety critical systems?
A. System failures could be life threatening.
B. The supplier of the safety critical system is not liable for any damage caused by the system.
C. Testing proves that there are no failures or defects in the system.
D. Traceability to regulatory requirements and compliance is not necessary.
<<<<<< =================== >>>>>>
Q. 107: You are involved in managing all the testing activities at all levels of testing, including unit testing, integration testing, and system testing. (There is no acceptance testing planned for this mass-market product.) A requirements specification, high-level design specification, and a low-level design specification will be written. You are currently writing the test plan, and deciding which test techniques should be applied to each level of testing. Which of the following statements is true?
A. Functional testing techniques are useful in all three levels of testing.
B. Structural testing techniques are useful only in unit testing.
C. Functional testing techniques are useful only in integration and system testing.
D. Structural testing techniques are useful only in integration and system testing.
<<<<<< =================== >>>>>>
Q. 108: Select the correct statement;
I. Comparing actual progress against the plan is part of Test Controlling activity.
II. Updating the test plan if needed is part of test controlling activity.
III. Prioritization criteria identified during risk analysis should be applied only during test execution.
IV. Test conditions are identified by analyzing the test basis and test objectives.
A. I and IV true. II and II false.
B. I, II and IV true. III false.
C. I, II and III true. IV false.
D. II, III and IV true. I false.
<<<<<< =================== >>>>>>
Q. 109: Failure Mode and Effect Analysis (FMEA) should be applied;
A. In safety critical systems
B. Only on underground systems
C. Only on air traffic systems
D. In all systems
<<<<<< =================== >>>>>>
Q. 110: Your company’s Chief Information Officer manager returns from a conference where she learned the economic and schedule benefits of reviews. She directs you, the quality assurance manager, to institute reviews immediately across all current and future projects. You are given a budget to bring in training in the review process. You are instructed to gather metrics on defects found and effort expended in reviews so that return on investment can be calculated.
Which of the following is a success factors for review introduction which is missing?
A. Management support
B. Pilot projects
C. Ability to measure return on investment
D. Provision for training in the review process
Read the Correct Answers of the above Questions
Full Database of All Question for Advanced Level Test Analyst and Technical Test Analyst Exams
Correct Answers to the Earlier Questions – Q. 91 to Q 100 are as under:
Question No. | Correct Answer |
Q. 91 | D |
Q. 92 | C |
Q. 93 | A |
Q. 94 | B |
Q. 95 | D |
Q. 96 | C |
Q. 97 | A |
Q. 98 | A |
Q. 99 | A |
Q. 100 | D |
An expert on R&D, Online Training and Publishing. He is M.Tech. (Honours) and is a part of the STG team since inception.