Software Testing Skill Review Test-Q 121 to 130
(Questions are useful for beginners as well as experienced QA Managers; who can review their skill before appearing in any interview)
Correct Answers to Earlier Questions – Q. 111 to Q 120 are at the end of this page:
Set of 10 Questions
Questions related to “Risk Management”
Q. 121: What is Risk analysis?
A. Evaluating risks
B. Evaluating Controls
C. Evaluating vulnerabilities
D. All of the above
<<<<<< =================== >>>>>>
Q. 122: Formal testing guidelines suggest which one of the following as the correct source of functional test cases?
A. The developer�s knowledge of what the software can do
B. The software design
C. The software requirements
D. The tester�s knowledge of what the software should do
E. The functional test procedures
<<<<<< =================== >>>>>>
Q. 123: Major component of Risk Analysis are
A. The probability that the negative event will occur
B. The potential loss is very high
C. The potential loss or impact associated with the event.
D. A and C.
<<<<<< =================== >>>>>>
Q. 124: Method of conducting Risk Analysis is
A. User your judgment
B. User your instinct
C. Cost of failure
D. All of the above
<<<<<< =================== >>>>>>
Q. 125: Which is not Testing Risk.
A. Budget
B. Number of qualified test resources
C. Sequence and increments of code delivery
D. Inadequately tested applications
<<<<<< =================== >>>>>>
Q. 126: If abnormal termination type X occurs 100 times per year, and the loss per occurrence is $500, then the loss associated with the risk is $50,000. What methods of measuring the magnitude of risk I am using?
A. Judgment
B. Annual loss expectation estimation
C. Risk Formula
D. Consensus
<<<<<< =================== >>>>>>
Q. 127: What is Cascading error?
A. Unrelated errors
B. Triggers a second unrelated error in another part
C. A functionality could not be tested
D. Two similar errors
<<<<<< =================== >>>>>>
Q. 128: Configuration defects will be introduced if
A. Environment is not stable
B. Environment does not mirror test environment
C. Environment does not mirror production environment
D. All of the above
<<<<<< =================== >>>>>>
Q. 129: Quality Risk is
A. Requirement comply with methodology
B. Incorrect result will be produced
C. Result of the system are unreliable
D. Complex technology used.
<<<<<< =================== >>>>>>
Q. 130: Risk control objectives are established in
A. Design phase
B. Requirement Phase
C. Testing Phase
D. Implementation Phase
Correct Answer of the above Questions
Full Database of Skill Review Test for Testing Engineers
Correct Answers to Earlier Questions – Q. 111 to Q 120 are as under:
Question No. | Correct Answer |
Q. 111 | D |
Q. 112 | B |
Q. 113 | D |
Q. 114 | B |
Q. 115 | D |
Q. 116 | D |
Q. 117 | A |
Q. 118 | C |
Q. 119 | C |
Q. 120 | A |