HP Performance Center Certification HPO-M17 Skill Review Test: Q. 51 to 60
Objective Type / Multiple Choice Questions on LoadRunner under the Series
(Quickly Review Your HP Performance Center (Users Site) Skills before appearing for HP Certification Exam HP0-M17)
Set of 10 Questions
Correct Answers to Earlier Questions – Q. 41 to Q 50 are at the end of this page:
Q. 51: What steps are involved to populate the initial dashboard for your project? (Select two.)
A. Record Vuser scripts
B. Apply Run-Time settings
C. Create benchmark load tests
D. Assign Vusers to Generators
E. Set performance targets using the Dashboard wizard
<<<<<< =================== >>>>>>
Q. 52: What are the available options for Load Criteria when setting a Service Level Agreement (SLA)? (Select four.)A. Input
B. Output
C. Throughput
D. Hits during test
E. Hits per minute
F. Running Vusers
G. Hits per second
H. Transactions per second
<<<<<< =================== >>>>>>
Q. 53: Where do you specify the Vuser scripts to run for the load test?
A. The Timeslots page
B. The Design Groups tab
C. The Scheduler Settings tab
D. The User Information menu
<<<<<< =================== >>>>>>
Q. 54: Within a project, what is the minimum amount of times the run time settings need to be applied?
A. One time
B. Two times
C. Four times
D. Three times
<<<<<< =================== >>>>>>
Q. 55: The database server receives information from four components. What are these components? (Select four).
A. User site
B. File server
C. Utility server
D. Administration site
E. Controller machine
F. Load generator machine
<<<<<< =================== >>>>>>
Q. 56: Where can you view the performance targets and results?
A. Dashboard
B. File and Reports
C. Run Results page
D. Run-Time Settings
<<<<<< =================== >>>>>>
Q. 57: Where do you configure your monitor settings?
A. In the Login Screen
B. In the Options tab on the Timeslots page
C. In the Calendar View of the Timeslots page
D. In the Monitors tab of the Load Test Configuration page
<<<<<< =================== >>>>>>
Q. 58: Which transactions should be set for a Service Level Agreement?
A. Transactions that have only passed results
B. Transactions deemed most critical to your test
C. The first five transactions sorted alphabetically
D. The transactions pre-selected by Performance Center by default
<<<<<< =================== >>>>>>
Q. 59: What is the primary reason Ramp Down functionality is used?
A. To let all Vusers stop at once
B. To load all Vusers in the test gradually
C. To monitor Performance Center servers
D. T gradually release resources of the system after a heavy load
<<<<<< =================== >>>>>>
Q. 60: How do you start to run a load test?
A. The Administrator must start the load test.
B. The test runs itself whenever a timeslot is available.
C. Navigate to the Manage tab and click the Run Test icon.
D. You must schedule a time when all the load generators are available.
Correct Answer of the above Questions
Access the Full Database of All Questions
Correct Answers to Earlier Questions – Q.41 to Q 50 are as under:
Question No. | Correct Answer |
Q. 41 | A,B,C |
Q. 42 | D |
Q. 43 | C,E |
Q. 44 | D |
Q. 45 | B |
Q. 46 | B |
Q. 47 | C |
Q. 48 | D |
Q. 49 | C |
Q. 50 | D |

An expert on R&D, Online Training and Publishing. He is M.Tech. (Honours) and is a part of the STG team since inception.