Software Testing Skill Review Test-Q 261 to 270
(Questions are useful for beginners as well as experienced QA Managers; who can review their skill before appearing in any interview)
Correct Answers to Earlier Questions – Q. 251 to Q 260 are at the end of this page:
Q. 261: which of the following would be applicable as part of a test policy for testing these types of systems?
a) Systems must be tested for compliance to industry standard routing protocols.
b) Testing for the latest upgrade will require testing of increased network traffic of 100�10.
c) Testing for the fix will require the use of dynamic analysis tools.
d) Releases will not be made if systems have any high priority defects outstanding.
A. a and b.
B. a and d.
C. band c.
D. band d.
<<<<<<=================== >>>>>>
Q. 262: You are convinced that delivery will be late. Which of the following reviews would be recommended at this time?
A. A management review of the test plan and results.
B. A walkthrough of the test plan and results.
C. A technical review of the user-stories.
D. An inspection of all code for the trading environment.
<<<<<< =================== >>>>>>
Q. 263: Which one of the following test tools would you recommend for the E2E phase.
A. A configuration management tool to ensure that all user-stories have been properly archived.
B. A test design tool to create the test cases as efficiently as possible.
C. A performance test tool to check that anticipated loading can be handled.
D. A modeling tool to verify the stock exchange pricing structures.
<<<<<< =================== >>>>>>
Q. 264: Which of the following test design techniques could be used to do this?
a) Statement testing.
b) Path testing.
c) State transition testing.
d) Exploratory testing.
A. a and c.
B. band c.
C. c and d.
D. a and d.
<<<<<< =================== >>>>>>
Q. 265: You need to test that the rules have been correctly set up in the configuration table, according to the specification.
Which one of the following test design techniques would be most suitable for this?
A. Data flow testing.
B. Statement testing.
C. Decision table testing.
D. Boundary value analysis.
More Questions shall be added to this Question Bank Shortly
Correct Answers to above Questions – Q. 261 to Q 265 are as under:
Question No. | Correct Answer |
Q. 261 | B |
Q. 262 | A |
Q. 263 | C |
Q. 264 | C |
Q. 265 | C |
Full Database of Skill Review Test for Testing Engineers
Correct Answers to Earlier Questions – Q. 251 to Q 260 are as under:
Question No. | Correct Answer |
Q. 251 | A |
Q. 252 | B |
Q. 253 | B |
Q. 254 | B |
Q. 255 | C |
Q. 256 | A |
Q. 257 | D |
Q. 258 | C |
Q. 259 | C |
Q. 260 | B |