QTP / UFT Certification-Review your Skills: Q. 461 to 470
Objective Type / Multiple Choice Questions on QTP – QuickTest Professional / UFT
(Quickly Review Your HP QTP / UFT Skills before appearing for Certification Exam)
Set of 10 Questions
Correct Answers to Earlier Questions – Q. 451 to Q 460 are at the end of this page:
Q – 461: Click Next or More to continue. Click the Task button.
<<<<<< =================== >>>>>>
Q – 462: Which checkpoint type should you use to validate the enabled state of a button?
A. Text
B. Standard
C. Bitmap
D. XML
<<<<<< =================== >>>>>>
Q – 463: Which term is used to define a string of special characters that define the condition of the search?
A. Constant expression
B. Placeholder
C. Regular expression
D. Parameter
<<<<<< =================== >>>>>>
Q – 464: You have multiple test cases that require you to test valid and invalid username and password combinations. Which parameter type should you use?
A. Output
B. Input
C. Random Number
D. Environment
<<<<<< =================== >>>>>>
Q – 465: Where is data for an Input parameter stored?
A. Run-time Data Table
B. Design-time Data Table
C. Run-time Data Repository
D. Design-time Data Repository
<<<<<< =================== >>>>>>
Q – 466: User-defined environment variables can be imported from an external file. What is the valid file type that can be imported?
A. txt
B. xml
C. csv
D. html
<<<<<< =================== >>>>>>
Q – 467: After playing back a test containing output values, where can the output values be viewed?
A. Global Data Table
B. Local Data Table
C. Design-time Data Table
D. Run-time Data Table
<<<<<< =================== >>>>>>
Q – 468: Which status is reported in the Test Results Summary if the test does not include checkpoints?
A. Fail
B. Passed
C. Done
D. Complete
<<<<<< =================== >>>>>>
Q – 469: You ran a test scenario with 10 iterations. What does the Test Results Summary report if 8 iterations pass and 2 iterations fail?
A. The summary reports PASS because more iterations passed than failed.
B. The summary reports the status for each iteration.
C. The summary reports DONE.
D. The summary reports FAIL because all iterations did not pass.
<<<<<< =================== >>>>>>
Q – 470: A tester uses QuickTest Professional connected to Quality Center and the tests are stored in Quality Center. At an upcoming conference, this tester wants to demonstrate a new QuickTest Professional test.
The test makes calls to reusable actions from other QuickTest Professional tests stored in Quality Center.
What is the simplest way to make the test portable so it can run disconnected from Quality Center?
A. Use the QuickTest Professional Save test with resources feature.
B. Change the calls to the reusable actions, use copies of the reusable actions, and then use the QuickTest Professional Save test with resources feature.
C. Use the QuickTest Professional Save test with resources feature for main test and do the same for the test that contains the called reusable actions.
D. Use the QuickTest Professional Export to zip feature.
Read the Correct Answer of the above Questions
Access the Full Database of All Questions
Correct Answers to Earlier Questions – Q.451 to Q 460 are as under:
Question No. | Correct Answer |
Q. 451 | A,E |
Q. 452 | In Picture |
Q. 453 | C |
Q. 454 | B |
Q. 455 | C |
Q. 456 | C |
Q. 457 | C |
Q. 458 | D |
Q. 459 | B |
Q. 460 | C |
An expert on R&D, Online Training and Publishing. He is M.Tech. (Honours) and is a part of the STG team since inception.