ISTQB Certification Exam-Sample Papers Q. 81 to 90
(Quickly Review Your Skills before appearing for ISTQB Certification Exam)
Set of 10 Questions.
Correct Answers to Earlier Questions – Q. 71 to Q 80 are at the end of this page:
Q. 81: The ________ and ________ are used within individual workbenches to produce the right output products.
A. Tools and techniques
B. Procedures and standards
C. Processes and walkthroughs
D. Reviews and update
<<<<<< =================== >>>>>>
Q. 82: Which aspects of testing will establishing traceability help?
A. Configuration management and test data generation
B. Test case specification and change control
C. Test condition and test procedure specification
D. Impact analysis and requirements coverage
<<<<<< =================== >>>>>>
Q. 83: The principle of Cyclomatic complexity, considering L as edges or links, N as nodes, P as independent paths
A. L-N +2P
B. N-L +2P
C. N-L +P
D. N-L +P
<<<<<< =================== >>>>>>
Q. 84: FPA is used to
A. To measure the functional requirements of the project
B. To measure the size of the functionality of an Information system
C. To measure the functional testing effort
D. To measure the functional flow
<<<<<< =================== >>>>>>
Q. 85: A _____ is the step-by-step method followed to ensure that standards are met
A. SDLC
B. Project Plan
C. Policy
D. Procedure
<<<<<< =================== >>>>>>
Q. 86: Which is not a test Oracle
A. The existing system (For a bench mark)
B. The code
C. Individual�s knowledge
D. User manual
<<<<<< =================== >>>>>>
Q. 87: PDCA is known as
A. Plan, Do, Check, Act
B. Plan, Do, Correct, Act
C. Plan, Debug, Check, Act
D. Plan, Do, Check, Accept
<<<<<< =================== >>>>>>
Q. 88: Which is the non-functional testing
A. Performance testing
B. Unit testing
C. Regression testing
D. Sanity testing
<<<<<< =================== >>>>>>
Q. 89: Which of the following is a MAJOR test planning task?
A. Determining the exit criteria
B. Measuring and analyzing results
C. Implementing corrective actions
D. Monitoring and documenting progress
<<<<<< =================== >>>>>>
Q. 90: Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads.
A. Load Testing
B. Integration Testing
C. System Testing
D. Usability Testing
Correct Answer of the above Questions
Access the Full Database of all Questions
Correct Answers to the Earlier Questions – Q. 71 to Q 80 are as under:
Question No. | Correct Answer |
Q. 71 | C |
Q. 72 | C |
Q. 73 | A |
Q. 74 | D |
Q. 75 | C |
Q. 76 | B |
Q. 77 | A |
Q. 78 | D |
Q. 79 | C |
Q. 80 | D |