ISTQB Certification Exam-Sample Papers Q. 741 to 750
(Quickly Review Your Skills before appearing for ISTQB Certification Exam)
Set of 10 Questions.
Correct Answers to Earlier Questions – Q. 731 to Q 740 are at the end of this page:
Q. 741: Consider the following activities that might relate to configuration management:
I. Identify and document the characteristics of a test item
II. Control changes to the characteristics of a test item
III. Check a test item for defects introduced by a change
IV. Record and report the status of changes to test items
V. Confirm that changes to a test item fixed a defect
Which of the following statements is true?
A. Only I is a configuration management task.
B. All are configuration management tasks.
C. I, II and III are configuration management tasks.
D. I, II and IV are configuration management tasks.
<<<<<< =================== >>>>>>
Q. 742: A test plan included the following clauses among the exit criteria:
# System test shall continue until all significant product risks have been covered to the extent specified in the product risk analysis document.
# System test shall continue until no must-fix defects remain against any significant product risks specified in the product risk analysis document.
During test execution, the test team detects 430 must-fix defects prior to release and all must-fix defects are resolved. After release, the customers find 212 new defects, none of which were detected during testing. This means that only 67% of the important defects were found prior to release, a percentage which is well below average in your industry. You are asked to find the root cause for the high number of field failures. Consider the following list of explanations:
I. Not all the tests planned for the significant product risks were executed.
II. The organization has unrealistic expectations of the percentage of defects that testing can find.
III. A version-control issue has resulted in the release of a version of the software that was used during early testing.
IV. The product risk analysis failed to identify all the important risks from a customer point of view.
V. The product risk analysis was not updated during the project as new information became available.
Which of the following statements indicate which explanations are possible root causes?
A. II, III and IV are possible explanations, but I and V are not possible.
B. All five are possible explanations.
C. I, IV and V are possible explanations, but II and III are not possible.
D. III, IV and V are possible explanations, but I and II are not possible.
<<<<<< =================== >>>>>>
Q. 743: What is the most important factor for successful performance of reviews?
A. A separate scribe during the logging meeting
B. Trained participants and review leaders
C. The availability of tools to support the review process
D. A reviewed test plan
<<<<<< =================== >>>>>>
Q. 744: Consider the following statements about maintenance testing:
I. It requires both re-test and regression test and may require additional new tests.
II. It is testing to show how easy it will be to maintain the system.
III. It is difficult to scope and therefore needs careful risk and impact analysis.
IV. It need not be done for emergency bug fixes.
Which of the statements are true?
A. I and III
B. I and IV
C. II and III
D. II and IV
<<<<<< =================== >>>>>>
Q. 745: Which of the following statements are correct?
I. Software testing can be required to meet legal or contractual requirements.
II. Software testing is mainly needed to improve the quality of the developer�s work.
III. Rigorous testing can help to reduce the risk of problems occurring in an operational environment.
IV. Rigorous testing is used to prove that all failures have been found.
A. I and III
B. II and III
C. II and IV
D. III and IV
<<<<<< =================== >>>>>>
Q. 746: Which two specification-based testing techniques are most closely related to each other?
A. Decision tables and state transition testing
B. Equivalence partitioning and state transition testing
C. Decision tables and boundary value analysis
D. Equivalence partitioning and boundary value analysis
<<<<<< =================== >>>>>>
Q. 747: Which of the following is an advantage of independent testing?
A. Independent testers don’t have to spend time communicating with the project team.
B. Programmers can stop worrying about the quality of their work and focus on producing more code.
C. The others on a project can pressure the independent testers to accelerate testing at the end of the schedule.
D. Independent testers sometimes question the assumptions behind requirements, designs and implementations.
<<<<<< =================== >>>>>>
Q. 748: DDP formula that would apply for calculating DDP for the last level of testing prior to release to the field is
A. DDP = {Defects (Testers) � Defects (Field)} / Defects (Testers)
B. DDP = {Defects (Testers) + Defects (Field)} / Defects (Testers)
C. DDP = Defects (Testers) / {Defects (Field) + Defects (Testers)}
D. DDP = Defects (Testers) / {Defects (Field) – Defects (Testers)}
<<<<<< =================== >>>>>>
Q. 749: What would trigger the execution of maintenance testing?
A. Inspection results and modification.
B. Migration and inspection results.
C. Migration and retirement of the system.
D. Alpha testing results and migration.
<<<<<< =================== >>>>>>
Q. 750: Popular specification-based techniques are:
A. Equivalence partitioning
B. Boundary value analysis
C. Decision tables
D. All three described above
Correct Answer of the above Questions
Access the Full Database of all Questions
Correct Answers to the Earlier Questions – Q. 731 to Q 740 are as under:
Question No. | Correct Answer |
Q. 731 | A |
Q. 732 | B |
Q. 733 | C |
Q. 734 | C |
Q. 735 | C |
Q. 736 | D |
Q. 737 | B |
Q. 738 | C |
Q. 739 | C |
Q. 740 | D |
An expert on R&D, Online Training and Publishing. He is M.Tech. (Honours) and is a part of the STG team since inception.
Thank you very much for the large and reliable question bank. The only way I can express the value of these questions is to let you know that I cleared the Foundation Level with a 100% score after just 3 days of prep-ing with only these questions! Thanks again…