Q. 471: The most important thing about early test design is that it:
A. Makes test preparation easier.
B. Means inspections are not required.
C. Can prevent fault multiplication.
D. Will find all faults.
<<<<<< =================== >>>>>>
Q. 472: Which of the following are potential drawbacks of independence in testing?
01. Independent testers may feel they are not part of the development team
02. Developers may lose a sense of personal responsibility for quality
03. Project managers will not have as much control on the project
04. Customers may end up requesting features that are technically impossible
A. 01 and 02
B. 01, 02 and 03
C. 03 and 04
D. 01, 02, 03 and 04
<<<<<< =================== >>>>>>
Q. 473: Integration testing in the small:
A. Tests the individual components that have been developed.
B. Tests interactions between modules or subsystems.
C. Only uses components that form part of the live system.
D. Tests interfaces to other systems.
<<<<<< =================== >>>>>>
Q. 474: Which of the following requirements is testable?
A. The system shall be user friendly.
B. The safety-critical parts of the system s
all contain 0 faults.
C. The response time shall be less than one second for the specified design load.
D. The system shall be built to be portable.
<<<<<< =================== >>>>>>
Q. 475: An important benefit of code inspections is that they:
A. Enable the code to be tested before the execution environment is ready.
B. Can be performed by the person who wrote the code.
C. Can be performed by inexperienced staff.
D. Are cheap to perform.
<<<<<< =================== >>>>>>
Q. 476: Test cases are designed during:
A. Test recording.
B. Test planning.
C. Test configuration.
D. Test specification.
<<<<<< =================== >>>>>>
Q. 477: A failure is:
A. Found in the software; the result of an error.
B. Departure from specified behaviour.
C. An incorrect step, process or data definition in a computer program.
D. A human action that produces an incorrect result.
<<<<<< =================== >>>>>>
Q. 478: How would you estimate the amount of re-testing likely to be required?
A. Metrics from previous similar projects
B. Discussions with the development team
C. Time allocated for regression testing
D. A. & B.
<<<<<< =================== >>>>>>
Q. 479: Given the following sets of test management terms (v-z), and activity descriptions (1-5), which one of the following best pairs the two sets?
v – Test control
w – Test monitoring
x – Test estimation
y – Incident management
z – Configuration control
1 – Calculation of required test resources
2 – Maintenance of record of test results
3 – Re-allocation of resources when tests overrun
4 – Report on deviation from test plan
5 – Tracking of anomalous test results
A. v-3,w-2,x-1,y-5,z-4
B. v-2,w-5,x-1,y-4,z-3
C. v-3,w-4,x-1,y-5,z-2
D. v-2,w-1,x-4,y-3,z-5
<<<<<< =================== >>>>>>
Q. 480: In a system designed to work out the tax to be paid:
An employee has �4000 of salary tax free. The next �1500 is taxed at 10% The next �28000 is taxed at 22%
Any further amount is taxed at 40%
To the nearest whole pound, which of these is a valid Boundary Value Analysis test case?
A. �1500
B. �32001
C. �33501
D. �28000
Correct Answer of the above Questions
Access the Full Database of all Questions
Correct Answers to the Earlier Questions – Q. 461 to Q 470 are as under:
Question No. | Correct Answer |
Q. 461 | D |
Q. 462 | C |
Q. 463 | A |
Q. 464 | A |
Q. 465 | B |
Q. 466 | D |
Q. 467 | A |
Q. 468 | D |
Q. 469 | B |
Q. 470 | B |