ISTQB Certification Exam-Sample Papers Q. 1011 to 1020
(Quickly Review Your Skills before appearing for ISTQB Certification Exam)
Set of 10 Questions � Q. 1011 to Q. 1020
Correct Answers to Earlier Questions – Q. 1001 to Q 1010 are at the end of this page:
Q. 1011: The following list contains risks that have been identified for a software product to be developed. Which of theserisks is an example of a product risk?
A. Not enough qualified testers to complete the planned tests
B. Software delivery is behind schedule
C. Threat to a patient�s life
D. 3rd party supplier does not supply as stipulated
<<<<<< =================== >>>>>>
Q. 1012: A test engineer is testing a Video Player (VCR), and logs the following report:
Title: Fast Forward stops after 2 minutes. It happens every time
Expected result: Fast forward continues till the end of the tape
Severity: High
Priority: Urgent
What important information did the engineer leave out?
A. Identification (Software and hardware) of the VCR
B. Actual result
C. History of the report
D. Ideas for the test case improvement
<<<<<< =================== >>>>>>
Q. 1013: Test data planning essentially includes
A. Network
B. Operational Model
C. Boundary value analysis
D. Test Procedure Planning
<<<<<< =================== >>>>>>
Q. 1014: Functional testing is mostly
A. Validation techniques
B. Verification techniques
C. Both of the above
D. None of the above
<<<<<< =================== >>>>>>
Q. 1015: Component integration testing can be done
A. Before Integration testing
B. After unit testing
C. After component testing
D. After system testing
<<<<<< =================== >>>>>>
Q. 1016: White Box Testing
A. Same as glass box testing
B. Same as clear box testing
C. Both A. and B.
D. None of the above.
<<<<<< =================== >>>>>>
Q. 1017: Equivalence partitioning consists of various activities:
A. Ensure that test cases test each input and output equivalence class at least once
B. Identify all inputs and all outputs
C. Identify equivalence classes for each input
D. All of the above
<<<<<< =================== >>>>>>
Q. 1018: Static Analysis
A. Same as static testing
B. Done by the developers
C. Both A. and B
D. None of the above
<<<<<< =================== >>>>>>
Q. 1019: In formal review, Rework: fixing defects found typically done by _________
A. Moderator
B. Author
C. Reviewer
D. Recorder
<<<<<< =================== >>>>>>
Q. 1020: The _________ may facilitate the testing of components or part of a system by simulation the environment in which the test object will run
A. Test Design tool
B. Test data preparation tool
C. Test execution tool
D. Test harness
E. None of the above
Correct Answer of All above Questions
Correct Answers to the Earlier Questions – Q. 1001 to Q 1010 are as under:
Question No. | Correct Answer |
Q. 1001 | B |
Q. 1002 | C |
Q. 1003 | A |
Q. 1004 | B |
Q. 1005 | B |
Q. 1006 | B |
Q. 1007 | D |
Q. 1008 | B |
Q. 1009 | D |
Q. 1010 | B |
An expert on R&D, Online Training and Publishing. He is M.Tech. (Honours) and is a part of the STG team since inception.