software testing genius

ISTQB Certification Exam-Sample Papers Q. 281 to 290

Welcome to “Software Testing Genius”. Subscribe to my RSS feed for latest content on Software Testing.

ISTQB Certification Exam-Sample Papers Q. 281 to 290

(Quickly Review Your Skills before appearing for ISTQB Certification Exam)

Set of 10 Questions.

Q. 281: In case of Large Systems :

A. Only few tests should be run
B. Testing should be on the basis of Risk
C. Only Good Test Cases should be executed.
D. Test Cases written by good test engineers should be executed.

<<<<<< =================== >>>>>>

Q. 282: What is the expected result for each of the following test cases?

vAlign=top width="30%">

Rule1

Rule2

Rule3

Rule4

Conditions

Citibank Card

Member

Yes

Yes

No

No

Type of Room

Silver

Platinum

Silver

Platinum

Actions

Offer upgrade

To Gold Luxury

Yes

No

No

No

Offer upgrade to Silver

N/A

Yes

N/A

No

A. Citibank card member, holding a Silver room
B. Non Citibank-member, holding a Platinum room

A. A Dont offer any upgrade, B Dont offer any upgrade.
B. A Dont offer any upgrade, B Offer upgrade to Gold.
C. A Offer upgrade to Silver, B Offer upgrade to Silver.
D. A Offer upgrade to Gold, B Dont offer any upgrade.

<<<<<< =================== >>>>>>

Q. 283: Which  typical  defects  are  easier to  find  using  static  instead  of  dynamic  testing?

L. Deviation  from  standards
M. Requirements  defects
N. Insufficient  maintainability
O. Incorrect  interface  specifications

A. L, M, N and O
B. L and N
C. L,N and O
D. L,M and N

<<<<<< =================== >>>>>>

Q. 284: Based  on  the  IEEE  Standard  for  Software  Test  Documentation (IEEE Std 829-1998), which sections  of the  test  incident  report  should  the  following  details  be  recorded?

a) Test  incident  report  identifier
b) Summary
c) Incident  description
d) Impact

1. Expected  results
2. Actual  results
3. Procedure  step
4. Environment
5. Revision  level
6. Date  and  time

A. a: 3; b: 5; c: 1, 2, 4 and 6
B. b: 5; c: 1, 2, 3, 4 and 6
C. b: 5 and 6; c: 1, 2, 3 and 4
D. a: 5; c: 1, 2, 3, 4 and 6

<<<<<< =================== >>>>>>

Q. 285: Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or unrelated software component:

A. Re Testing
B. Confirmation Testing
C. Regression Testing
D. Negative Testing

<<<<<< =================== >>>>>>

Q. 286: Consider the following state transition diagram of a switch. Which of the following represents an invalid state transition?



A. OFF to ON
B. ON to OFF
C. FAULT to ON

<<<<<< =================== >>>>>>

Q. 287: We use the output of the requirement analysis, the requirement specification as the input for writing:

A. User Acceptance Test Cases
B. Integration Level Test Cases
C. Unit Level Test Cases
D. Program specifications

<<<<<< =================== >>>>>>

Q. 288: Regression testing should be performed:

i. Every week
ii. After the software has changed
iii. As often as possible
iv. When the environment has changed
v. When the project manager says

A. i & ii are true, iii, iv & v are false
B. ii, iii & iv are true, i & v are false
C. ii & iv are true, i, iii & v are false
D. ii is true, i, iii, iv & v are false

<<<<<< =================== >>>>>>

Q. 289: Which  input  combinations  will a  knowledgeable  tester  MOST  LIKELY  use  to  uncover potential  errors  when  testing  a  surname  field?

A. Wilson, de Costa and Morgan
B. Go, Cheenaswamimuthusami and Venkatsewaran
C. Smit,  Smyth  and  Smithson
D. O'Lever,  Lesa-Brit  and  Jewel  D
e

<<<<<< =================== >>>>>>

Q. 290: Which of the following has highest level of independence in which test cases are:

A. Designed by persons who write the software under test
B. Designed by a person from a different section
C. Designed by a person from a different organization
D. Designed by another person

Correct Answer of the above Questions

Access the Full Database of all Questions

Quickstart to ISTQB Foundation Exam - Key Questions Answered

ISTQB Foundation Exam - Full Crash Course (Set of 35 Parts)

ISTQB Advanced CTAL Test Analysts Exam - Full Crash Course

ISTQB Advanced CTAL Test Manager Exam - Full Crash Course


ISTQB Certification Preparation Help Guide

Practical Roadmap to ISTQB Certification

Twelve Top Questions about ISTQB Certification
 

If you want to keep track of further articles on Software Testing,
I suggest you to subscribe my
RSS feed
.

You can also Subscribe by E-mail
and get All New articles delivered directly to your Inbox.


Quick Navigation of Software Testing Genius

Get your Absolutely Free Copy of Several MS PowerPoint Presentations & E-Books related to ISTQB, HP Load Runner, IBM RFT, HP QTP & QC Certification Exams, prepared by Popular Writers & Trainers, by writing to: Software.testing.genius@gmail.com

Full Study Material for Popular Certification Exams:

Study Material - HP QTP & QC Certification Exam

Study Material - HP LoadRunner Certification Exam

Study Material - IBM RFT Certification Exam

Consolidated Study Material - Testing & QA

Most Popular Topics in Demand:

Practical Roadmap to QTP Certification

Practical Roadmap to CSTE Certification

Rehearsal of QTP in 1 Hr. -  Interview Questions

Correct Answers to the Earlier Questions - Q. 271 to Q 280 are as under:

Question No.

Correct Answer

Q. 271

A

Q. 272

B

Q. 273

B

Q. 274

B

Q. 275

A

Q. 276

A

Q. 277

A

Q. 278

C

Q. 279

B

Q. 280

B

 

Comments :

0 comments ↓


Leave Your Comments: (*) Marked Fields are Mandatory

You can apply basic formatting to the text

Name *
 
Email Address *
 
Website
 
Speak your mind
characters
sex hikayeleri